Rufford Primary School

Stourbridge, West Midlands
Suitability:
KS1
EYFS
Project Descriptions

Location: Stourbridge, West Midlands

Project Value: £177,000

Age Range: 3-7

 

KEY OUTCOMES

  • 7 Areas of Learning achieved.
  • Completely renovated an unused space.
  • Significant improvement in children’s language development.
  • An exciting play area to be enjoyed all year round.

 

FEEDBACK FROM THE CUSTOMER 

“We worked with Fawns to create our new EYFS outdoor area. Fawns had been recommended to us by the former headteacher of another school, and we were very impressed with the design and the professionalism of the team we worked with. The build was completed within the time frame given and all the equipment is of a very good standard. I would certainly have no issue working with Fawns again.”

Paul Crosthwaite – Assistant Headteacher

Check out the video of the final install!

 

BACKGROUND

Rufford Primary School is situated in the market town of Stourbridge.

The school has a strong vision to ensure every child, without exception, should be proud of who they are and leave the school for the next stage with all the skills and knowledge needed to thrive.

 

PROJECT BRIEF

As part of the school’s development plan it was noted that the Early Years Area desperately needed to be updated, there were approximately 70 tyres in the area and fencing that was damaged due to the number of years it had been there.

An entirely new play space was required to cover all 7 areas of learning, mainly focusing on children’s language skills and physical development.

 

DESIGN PROCESS

Our play consultant Adam visited the school and discussed plans and ideas with the assistant headteacher. One of the main concerns was that the area flooded, but Adam came up with a solution while creating a bright, eye-catching design that made the most of the space.

All areas of learning were considered during the process and further discussions between Adam and the school resulted in a perfect final proposal.

The new playground was installed in September 2023.

 

COMPLETED PROJECT

Bespoke Fort CumberlandBug Magnifier PostLog Planter Boxes
2100 Trail Walk & Stretch4m PavilionWooden Skip & Blocks
Pathfinder Traverse WallStoryteller ChairSand and Water Tray Play Table
Log Traverse 2100Mark Making ChalkboardPhysical Development Blocks
Link Mini Balance BeamMark Making MirrorSailaway Canopy
Hummock HillGrass Topped SeatWeighing Scales
Messy KitchenSandbox with Gameboard TableDuralawn Surfacing
Magnetic Water WallPlay BarnWetpour Surfacing
Bow Top FencingConstruction Pit

 

OTHER PROJECTS TO READ

Martongate Primary School

Gravel Hill Primary School

Interested In A Project Like This?
01252 515199 Contact Our Team